Progress

It is winter, with snow covering a huge part of the country, especially in the South Island. We had a dusting here in Wellington, but mostly cold rain. Sleeping in every morning is still a priority, with the rest of today sewing. I have made progress with all three quilts. 53 blocks done of the blue Elm Creek Quilt, and 13 each for the two Farmer’s Wife quilts. My aim is to have 55 blue blocks done by the end of next week and 20 for each of the Farmer’s Wife quilts.

OLYMPUS DIGITAL CAMERA
Two Farmer’s Wife quilts – 13 blocks for each done
OLYMPUS DIGITAL CAMERA
Elm Creek Quilt – 53 blocks and Bella the cat
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s